Every real lens is ground slightly wrong. Tolerancing asks the only question that matters commercially: if you build a hundred of these, how many meet spec?

Setting tolerances

Each part gets five manufacturing tolerances. Set tolerances on every part fills in a sensible starting set:

ToleranceRepresents
radius %How far a ground radius may stray from nominal
thickness mmCentre thickness error
decenter mmThe element sitting off-axis in its mount
tilt degThe element tipped in its mount
axial mmSpacing error along the beam

Running the analysis

SettingMeans
criterionWhich operand decides pass or fail — usually RMS spot on the screen
refocusJudge every perturbed build at its own best focus, as if the screen were refocused during assembly. This is the standard compensator and it matters enormously
trialsHow many random builds to simulate (300 by default)
Uniform / GaussianErrors spread evenly within ±tol, or normally with sigma = tol/2 clipped at ±tol
specThe value a build must beat to count as good

Reading the result

  • Nominal — the criterion for the perfect design.
  • RSS estimate — the quick root-sum-square prediction from the sensitivity table.
  • Monte-Carlo mean and sigma — what actually happened across the trials.
  • Percentiles — "50% of builds ≤ x, 90% ≤ y, 98% ≤ z". This is the honest picture of your production run.
  • Yield — the share of builds that beat your spec.
  • Unbuildable builds — perturbations that made parts collide, and builds where the beam was lost entirely. Both count as failures, because both are.

Worst offenders

The sensitivity table lists every tolerance item with how much the criterion changes at +tol and −tol. Sort by that and you know exactly which surface to specify more tightly — and, just as usefully, which ones you can loosen to save money.